ATS systems
New transfer equipment
Coordinate a transfer switch with the selected normal and alternate sources and the loads it will serve.
Plan the transfer before the outage.
An automatic transfer switch connects selected loads to an available power source. Plan it with the generator, distribution, and operating requirements of the building.
Plan the transfer before the outage.
ATS systems
Coordinate a transfer switch with the selected normal and alternate sources and the loads it will serve.
ATS systems
Review existing transfer equipment, ratings, connections, and operating sequence before planning replacement.
ATS systems
Define generator interfaces, control connections, test responsibilities, and the path for returning to normal supply.
Before defining the work, we review how your property operates and what the equipment needs.
Identify the circuits or distribution served by the switch and distinguish their operating requirements.
Voltage, poles, source arrangement, equipment ratings, and transition requirements must suit the design.
Plan a controlled functional test and future access with the facility team and generator provider.
Send what you have. These details help us prepare for your ats systems project.
No. It switches between sources. The alternate source, such as a generator, must also be available and suitable for the connected load.
Timing depends on source availability and the system sequence. Loads needing uninterrupted power may need a separate UPS solution.
The generator, controls, distribution, and proposed loads need review together. Compatibility and the complete installation scope must be confirmed first.
Equipment references
Share the property address, equipment or plans, and the timing you have in mind. Attach photos below to help us understand the work.