Plan the transfer before the outage.

Automatic transfer switch installation

An automatic transfer switch connects selected loads to an available power source. Plan it with the generator, distribution, and operating requirements of the building.

ATS systems: the work we can help with.

Plan the transfer before the outage.

ATS systems

New transfer equipment

Coordinate a transfer switch with the selected normal and alternate sources and the loads it will serve.

    ATS systems

    Replacement & upgrades

    Review existing transfer equipment, ratings, connections, and operating sequence before planning replacement.

      ATS systems

      System coordination

      Define generator interfaces, control connections, test responsibilities, and the path for returning to normal supply.

        The details that shape the project.

        Before defining the work, we review how your property operates and what the equipment needs.

        • Which loads transfer?

          Identify the circuits or distribution served by the switch and distinguish their operating requirements.

        • Match the system

          Voltage, poles, source arrangement, equipment ratings, and transition requirements must suit the design.

        • Test & maintenance access

          Plan a controlled functional test and future access with the facility team and generator provider.

        A useful starting point.

        Send what you have. These details help us prepare for your ats systems project.

        • Existing one-line diagram, if available
        • Generator and transfer-switch model information
        • List of loads requiring backup
        • Outage window and facility contact

        Common questions.

        Does an ATS provide power by itself?

        No. It switches between sources. The alternate source, such as a generator, must also be available and suitable for the connected load.

        Is the transfer instant?

        Timing depends on source availability and the system sequence. Loads needing uninterrupted power may need a separate UPS solution.

        Can a transfer switch be added to an existing generator?

        The generator, controls, distribution, and proposed loads need review together. Compatibility and the complete installation scope must be confirmed first.

        Plan the transfer before the outage.

        Share the property address, equipment or plans, and the timing you have in mind. Attach photos below to help us understand the work.

        408-614-4451

        Loading inquiry form…

        Call (408) 614-4451Request an estimate

        We use necessary browser storage to remember your choice. With your permission, Google Analytics helps us understand which pages are useful. Contact forms work either way. See our privacy policy.